NCWAP 2015 Research Priority 6

From NC Bird Conservation
Jump to: navigation, search


Research Priority

Specific bog management needs to include the control of woody encroachment and succession, the maintenance (and where necessary, restoration) of natural surface water and groundwater hydrology (using ditch plugs, temporary dams, level spreaders, or other engineering devices), the restoration of herbaceous vegetation, and the prohibition of taking rare bog-related species (e.g., Bog Turtle).

Associated Habitats

Associated Species

Research Priority +
Specific bog management needs to include tSpecific bog management needs to include the control of woody encroachment and succession, the maintenance (and where necessary, restoration) of natural surface water and groundwater hydrology (using ditch plugs, temporary dams, level spreaders, or other engineering devices), the restoration of herbaceous vegetation, and the prohibition of taking rare bog-related species (e.g., Bog Turtle).re bog-related species (e.g., Bog Turtle). +